"BIG FOOT 08"
or
2003_04
until 2003_04_18
Whilst the March 2003 the crane in the "garage" has
been completed. I am now able to lift even heavy items with 150 kg and more.
So the small motorcycle (it really a very small one, max. 40 km/h, I really
look a little bit strange on it; picture may follow) can now be carried easily.
Next picture shows the wardrobe. The front
doors are
still missing. The view is from the rear to the front. On the left in front you
can see the rear side of the bench (bench itself still in progress). To the
right of the wardrobe is a small storage box above the entrance door.
The big rear
door is open and therefore the "garage" is
illuminated that much. The ground of Robin's bed is now
installed. In front of the beds are now already two upright walls and
between these wall is the area for the refrigerator and the Microwave.
Above the microwave will remain a very small storage area for very flat items
only. On the floor you can see the sink for the kitchen. All
the now installed wooden items will be removed after they have been installed
because they are not yet painted. So at this stage it is just a first
installation to make everything fit, than take it out and polish and finish
the surface, paint it and reinstall it again.
Tomorrow and Easter Sunday I will complete some work on the electricity
(which
you will not see because everything will be in the "cellar" hidden)
before I start again on Easter Monday with the woodwork together with the
carpenter. So maybe I may have some more pictures on Monday evening again.
Otherwise the update may follow the weekend after Easter after my return from
the next business trip to an exhibition in the Netherlands.