"BIG FOOT 20"
or
2004_03_06
& 2004_03_14
Hurra, the fresh water tanks are
ready. I have made several photos: a view to the inside with the breakwater
wall, with top plate mounted, the side with most of the holes for sensors for
filling level, UV sterilisation and connectors for filling & release
and of course both together.
Here both last week Friday after
pick up.
Here a more detailed picture with
the pipe to drain the tank (on the bottom), the suction pipe (small one on the
left), the filling pipe (top), lots of drills for the sensors of the water level
and the big hole on the top for the wire for the UV-light sterilisation .
Die
Here a more detailed picture with
the suction pipe from inside.
The sensors of the water level are
mounted (left side). The surface underneath has been coated with a special glue to prevent
flow of current between the sensors when wet. The catches for the UV-light sterilisation
has been fixed as well with that glue.
Here are the cabels of the
sensors of the water level and the wire for the UV-light sterilisation from the
outside.
Tank 1 is meanwhile mounted and the
top plate fixed. Between the wall of the tank and the wooden frame I have put an
isolation plate and to prevent that small bits and peaces fall betwen the two
walls I have covered the top with tape. Tank 2 is still open.
The
filling pipes are fitted with 3/4" pipes for easy disconnection if required.
These pipes will be connected next week to the fixed pipes which reach to the
big door of the garage.