"BIG FOOT 18"
or
2004_01_11
A
happy new year to all of you interested in this homepage!
Second
but last weekend nearly all missing doors have been prepared so far that I was
able to paint and mount them this week. In the upper board, dividing the
kitchen- from the seating-area the coffee-machine found it's place - extremely
important!
The
drawer of the wardrobe was finished (it is the long board between the upper and
lower doors), in which the keyboard and mouse for the PC and lot of other stuff
will be stored.
Unfortunately
the veneer of the very left door wasn’t perfect so this one must be veneered
again. But underneath you can see the blind for the PC storage. On the left is
some space left for the subwoofer and most likely storage for CD’s.
The
doors in front of the fridge were finished. As soon as I will have organised a
sliding connection from the fridge doors to the front doors this will be
complete as well. Above the microwave is a wide and broad but very narrow
compartment for tablets etc..
Here
you can see my wife testing if even with the not finished ladder there will be
enough space left for our son to enter and leave his bed. Once the ladder will
be finished it can be lifted up and pushed underneath the mattress and locked.
This means whilst daytime the bottom part of the ladder will be in one line with
a board in front of the mattress.
The
test of the modified seating area showed positive results!!!